Elaboration of a technical project for an Installation for Aluminium production from waste materials– RJ Institute JSC, Skopje, Republic of Macedonia and construction of an installation for the production itself. The realisation of the Project was financed by Crown Agents – London, and the equipment for the installation is supplied by Ecotech Engineering Ltd.

 

Elaboration of a technical project to construct a new capacity for cast iron production from ferro-containing waste on the territory of Kremikovtsi JSC – jointly with the company Кuttner GmbH&Co Kg, Germany.

 

Design and construction of a unique installation for catching, neutralizing and eliminating the smell of technological gasses, emitted during cigarettes production in Sofia-BT AD.

 

Elaboration of a technical project for the reconstruction of an electric-reduction furnace 600 kVA – RJ Institute JSC, Skopje, Republic of Macedonia.

 

Elaboration of a technical project for the reconstruction and rehabilitation of furnaces for metallurgical lime production, Skopje, Republic of Macedonia.

 

Design and construction of an installation for ferroalloys production, together with a dust-removing system.

 

Elaboration of a technical project for an installation for continuous horizontal casting of copper alloys – RJ Institute JSC, Skopje, Republic of Macedonia.

 

Elaboration of a technical project for a system of pneumatic channels to transport ash and development of a dust-removing system for catching of dust emissions – Cement plant TITAN JSC, Skopje, Republic of Macedonia.

 

Elaboration of a technical project for a fuel chamber to a drum-drier for vermiculite.

 

Repair, start-up and adjustment works in projects of the Bulgarian National Bank.

 

Elaboration and delivery of contact jaws for ferroalloy production of SKOPSKI LEGURI DOOEL, Skopje, Republic of Macedonia.

 

Delivery of 236 pieces of HEPA filters, filtration class H14 for MEDICA JSC, town of Sandanski.

 

Delivery of laboratory equipment for research work on ferroalloys SKOPSKI LEGURI DOOEL, Skopje, Republic of Macedonia.

 

Delivery and installation of an additional system for leading away the hot air, separated from screw compressors located in the compressor station – PLENA BULGARIA LTD, Sofia.

 

Elaboration of a draft project for "Installation for crushing and screening of ferroalloys" and delivery of equipment for the installation - SKOPSKI LEGURI DOOEL, Skopje, Republic of Macedonia.

 

Elaboration of a draft project for an installation for crushing and screening of ferroalloys slag and delivery of equipment for the installation - SKOPSKI LEGURI DOOEL, Skopje, Republic of Macedonia.

 

Research work related to the metallurgical estimation of quartz for metal silicon production in an electric-reduction furnace – KIM JAROLIM GmbH, KIM JAROLIM GmbH, Germany.

 

 

 

 

Rehabilitation and construction of new farm silo for storing, handling, loading and measurement of active loaded into open trucks and tanks crushed lime.

 

Reconstruction and delivery of new bag filters to incinerators for solid fuels and bio-fuel.

 

Design and delivery of a multi-cyclone group for dust removal from transportation lines and stone crushing installations.

 

Supply of filters for dust removal of silos.

 

System for dedusting of a biomass-burning steam boiler with capacity of 10 000 m3/hour bundled with a settling chamber and a multi-cyclone group.

 

Installation trapping the dust from a drying drum for aggregates with a capacity of 16 000m3/hour

 

Aspiration and filtration system with capacity of 35 000m3/hour to capture the gases from a hot dip galvanizing bath.

 

A technological bag filter for the flue gases from a vertical lime kiln - Q=25 000m3/hour

 

Cartridge filter for dedusting the unloading of а vertical lime kiln and unloading nodes of ready production line - Q=5 000 m3/hour

 

Double set of Bag filters for a 60 meters long technological rotary kiln for metallization of iron containing slurries.- Q=2 х 25 000 m3/hour

 

Reconstruction and implementation of bag filters for two filling lines for lime – Q=25 000 m3/hour

 

Filter system for boilers burning RDF - Q=18 000m3/hour

 

Silos for lime with metered unloading and anti-vault pneumatic hammers.